
Add to Cart
Guangzhou jijian jet produce Metal Scaffolding Steel Planks Suspended Catwalk For Scaffold
Product Description
Scaffold plank
Material: Q195
Surface: Pre galvanized, perforated
Type: no hook
width: 165mm-500mm
Thickness: 1.0mm-2.0mm
Length: customization
Some popular sizes for reference:
210*45*1m | 225*38*1m | 240*45*1m | 250*50*1m | 420*45*1829mm |
210*45*1.5m | 225*38*1.5m | 240*45*1.5m | 250*50*1.5m | 450*45*1829mm |
210*45*2m | 225*38*2m | 240*45*2m | 250*50*2m | 480*45*1829mm |
210*45*2.5m | 225*38*2.5m | 240*45*2.5m | 250*50*2.5m | 500*50*1829mm |
210*45*3m | 225*38*3m | 240*45*3m | 250*50*3m | |
210*45*4m | 225*38*4m | 240*45*4m | 250*50*4m |
Terms of payment: 30% deposit then pay balance after rec
eive copy of B/L or L/C at sight
Delivery: within 10 days after receive deposit
Package: in bulk or in bundles, as per client's request (generally in 40'HQ)
Supply Ability
Supply Ability:
20000 Metric Ton/Metric Tons per Month
Packaging & Delivery
Packaging Details
in bulk or in bundles, as per client's request (generally in 40'HQ)
Port
Tianjin
Lead Time :
within 15 days after receiving the deposit or copy of L/C