
Add to Cart
Gi Pipe 1.5 inch Galvanized Steel Pipe Scaffold Tube Building Material St37 Welded Low Carbon
Features of scaffolding welded tube
1. scaffolding welded tube are made of Q235 steel with high strength and durability.
2. scaffolding welded tube can be jointed together at any angle with the right coupler. They are wonderful succedaneum of standard scaffoldings and steel props.
3. scaffolding welded tube are widely used in construction and real estate which are much cheaper and convenient.
4. scaffolding welded tube are multi-functional; they can be cut at any length as the customers’ requirement.
5. scaffolding welded tube match with couplers are good choice for outside masonry construction and also proper for inside concrete support.
BS EN39:2001 | |||||
Outer Diameter | Wall Thickness | Weight | |||
mm | Tolerance | mm | Tolerance max | K.G / meter | Tolerance max |
48.3mm 1 1/2" |
±0.5mm | 3.2 | -10% | 3.6 | -7.5% |
4.0 | 4.0 |
Scaffold Tubes Building Material St37 Galvanized Steel Pipe
Commodity | hot dipped and pre-galvanized steel pipe |
OD | 10-600mm(round) |
thickness | 1.2-30mm |
length | 3-12m or as per customers' requirements |
material |
Q195-Grade B, SS330, SPC, S185 Q215-Grade C,CS Type B, SS330, SPHC Q235---Grade D, SS400, S235JR, S235JO, S235J2 Q345---SS500, ST52 |
Standard |
GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88
BS1387/1985,ASTM A53/A36,EN39/EN10219,API 5L, GB/T9711.1-99 etc
|
zinc coating |
pre galvanized steel pipe: 60-150g/m2 hot dipped galvanized steel pipe:200-400g/m2 |
application |
Widely used in Structure, Accessorize,Construction, Fluid transportation,machinery parts,the stress parts of the automobile tractor parts and so on
|
Package |
1) Big OD: in bulk 2) Small OD: packed by steel strips 3) Plastic bags 4) According to customer's requirement |
Delivery | Normally 7-20 days after get deposits or according to quantity |
Certification |
ISO 9001-2008 BV TUV |
advantage |
1. reasonable price with excellent quality
2, abundant stock and prompt delivery
3, rich supply and export experience, sincere service |
About us:
1. We are one of those top sophisticated manufacturers in China with scaffolding field experience of over 30 years. We introduced advance automatic production line from Japan in 2005.
2. We have professional designers and engineers to provide the best solutions for your own project to gain access to almost any place.
3. We otained quality awards ISO9001:2008,ANAB of USA and UKAS of Britain and our aluminium rolling towers are certified to comply European Standard EN1004.
4. We OEM for PERI, HARSCO, SGB, ALUMA, MODERN company.
Our service
1 Customer first
2 Repaid response
3 Low MOQ
4 Quick delivery
5 Competitive price
6 Free sample is available
7 The commodity you required could be customized
8 Professional service of technical and shipping support
9 More than 5 years experience in steel tube / black steel pipe / welded steel pipe.